Planned Projects
In order to accomplish the mission of producing one million tonnes of metal by 2010, we have announced new projects (Phase III), post completion of which, we will become the largest integrated Zinc-Lead producer in the world having Zinc & Lead metal production capacity of 1064,000 tonnes per annum.
- 210,000 tonnes per annum Hydrometallurgical Zinc Smelter at Rajpura Dariba
- 100,000 tonnes per annum Lead Smelter at Rajpura Dariba
- Rampura Agucha Mine expansion from 5.00 million tonnes per annum to 6.00 million tonnes per annum
- Sindesar Khurd Mine expansion from 0.30 million tonnes per annum to 1.50 million tonnes per annum
- Opening of a new mine at Kayar with an initial capacity of 0.30 million tonnes per annum.
- 2 x 80 MW Coal based Captive Power Plant at Rajpura Dariba
- Increase in silver production capacity from 150 tonnes per annum to 500 tonnes per annum.
Of the above projects, we have successfully commissioned the 210,000 tonnes per annum Hydrometallurgical Zinc Smelter at Dariba Smelting Complex and the 1.00 million tonnes per annum concentrator in Rampura Agucha, in March 2010. Our current metal production capacity is 964,000 tonnes per annum (879,000 tonnes of zinc and 85,000 tonnes of lead). The ore production capacity currently stands at 8.60 million tonnes per annum.